EV Charger Installation in South London

Supply and installation of smart EV chargers for homes and businesses, with circuit design, inspection, load management and commissioning tailored to your property.

NAPIT Approved ContractorOZEV-approved installerAll major EV charger brands
Smart EV Charging
Our installation service

EV charger installation from assessment to handover.

A practical electrical design is more important than simply fixing a wall charger to the outside of a building.

Home charging

A dedicated supply for private parking or a suitable garage. We select equipment, protective devices and a cable route after assessing the existing installation. Typical UK domestic charging is around 7 kW on suitable single-phase supplies.

We review the position of the car charge port, tethered or untethered options and charging cable storage.

Workplace and multi-bay charging

Commercial installations can require demand forecasting, supply upgrades, dynamic load balancing, user permissions, RFID access or online reporting. We scope those needs before quoting.

Multi-bay installations may need civil works and metering arrangements in addition to electrical installation.

Survey checklist

What we assess before work starts.

The suitability of the intake and earthing arrangement, and permissions for the location, determine whether an installation is straightforward or requires further work.

ELECTRICAL

Supply & maximum demand

Existing service head, meter equipment, earthing, maximum demand, protective-device provision and available capacity.

Find out more →
BUILDING

Parking & cable route

Charger location, access, cable route length, surface finishes, any drilling or trenching, and cable mechanical protection.

Find out more →
CONNECTED

Connectivity & smart controls

Wi-Fi or mobile coverage, app access, off-peak scheduling, compatible solar or battery integration and load management.

Find out more →
NOD process

Four steps to a tested installation.

We explain the scope and any limitations before work begins. A longer run, additional containment or permissions can affect the programme.

01 / 01

Initial enquiry

Send postcode, parking layout, chosen charger and photographs.

02 / 02

Survey and specification

Review intake, earthing, route, electrical demand and permissions.

03 / 03

Install the charge point

Fit the circuit and equipment, then arrange required DNO steps.

04 / 04

Commission and certify

Inspect, test, configure apps and provide documentation.

Product selection

Which charger should you choose?

The correct choice balances day-to-day convenience, model specifications and the equipment already installed.

Installer independent of brand

All major charger manufacturers.

We do not limit installations to the six brands shown here. They are representative of the range available. We will discuss other options or customer-supplied equipment.

FAQ

Technical and practical questions.

Charger manufacturers and BS 7671 Section 722 set requirements that must be assessed for the actual installation.

Can you fit an EV charger to an existing consumer unit?

Often, but we must assess spare capacity, condition, circuit protection, fault-loop conditions and other installation requirements. A dedicated enclosure may sometimes be more suitable.

Does every EV charger need an earth electrode?

No. Earthing and open-PEN measures depend on the supply, equipment and location. We assess the applicable permitted arrangement.

Can I connect a charger to a detached garage?

Possibly. The circuit route, garage supply, earthing arrangement, cable mechanical protection and total demand need assessment.

What about shared parking or a rented flat?

We first check legal parking rights, permissions, metering, cable routes and the supply before selecting equipment.

What is the difference between 7 kW and 22 kW AC charging?

A 22 kW charger needs a suitable three-phase supply and a vehicle with a compatible onboard AC charger. Many homes have single-phase supplies and use chargers around 7 kW.

Do you complete DNO notification?

We establish whether DNO notification or prior approval is required and agree any associated work and responsibility in the scope.

Next steps

Charging installation costs and service coverage.

Get an indicative budget before committing to equipment; larger commercial and communal schemes need a tailored assessment.

Transparent installation estimates

Our cost guide sets out typical home installation ranges and the circumstances that lead to extra work, including cable routes, supply alterations and groundworks.

Read the EV installation cost guide →

South London and wider EV coverage

From Streatham, Balham and Tooting to Wandsworth, Wimbledon and Dulwich, plus selected EV installations around Kingston and Epsom & Ewell.

See Areas We Cover →
Streatham based · South London

Discuss your EV charging project.

Tell us your postcode, vehicle, parking arrangement, the proposed cable route and any preferred charger. We will explain the next steps and whether a survey is needed.